Baggage Handling System Control Room Relocation
Reference number: 2026-Q2(Apr-Jun)-AVI-20117
Anticipated Posting Date: 2026-07-27
The project involves the interior upfit of approximately 2,000 square feet of existing shell space on the baggage level of the main terminal at CLT Airport, including a baggage handling control room, support space, and a break room. The predominant work will consist of typical finishes such as drywall, ceilings, flooring, mechanical, electrical, plumbing, and fire protection.
Status: Upcoming