Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Anticipated Posting Date: 2026-04-20

  • Reference number2026-Q2(Apr-Jun)-CSWS-19055
  • StatusUpcoming
  • SummaryProject initiated due to failure of 96in system. City plans to remove and replace 96in CMP with 62LF 9'x6' RCBC; Add (2) concrete wingwalls; Add (1) DCB CLDS 20.03; Add (1) CLDS 20.05; Add (2) NCDOT 840.01 CB's; City plans to add approx. 87 LF of 15in RCP; Curb and gutter replacement; pavement resurfacing.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • Constructions Bonds-For bidding, payment, completion of construction projects
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
  • Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
  • Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $1,000,000 -4,999,999

Contract Term

The term of the project is anticipated to be:

  • Through Project Completion