Brooklain-Coulwood Storm Drainage Improvement Project

Anticipated Posting Date: 2027-03-05

  • Reference number2027-Q1(Jan-Mar)-CSWS-20579
  • StatusUpcoming
  • SummaryThe Brooklain-Coulwood Storm Drainage Improvement Project is bordered by Cathey Road to the east, Brooklain Drive to the south, Waycross Drive to the west, and Coulwood Drive to the north. This construction project involves addressing flooding concerns and structurally deficient City pipe system at a total of 4 culverts.

An analysis of existing conditions was performed to determine portions of the storm drainage system needing improvement as well as planning analysis of improvement alternatives. Design phase efforts will be performed as well as construction of needed improvements.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • Constructions Bonds-For bidding, payment, completion of construction projects
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
  • Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
  • Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $1,000,000 -4,999,999

Contract Term

The term of the project is anticipated to be:

  • Through Project Completion