Anticipated Posting Date: 2026-10-01
There is also a 139LF section of 15" RCP to be CIPP lined. 3653 Trailer Dr. aims to realign the existing 24" system to a new outfall point into the stream. The design also requires lining 100LF of 24" CMP with CIPP at the upstream end of the system.
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
The City plans to require the following bond(s) for this solicitation:
The total project value is anticipated to be:
The term of the project is anticipated to be:
Print Page
Department:Storm Water
Commodity Code(s): 65951 91223 91319 91339 91345 91347 91396 91430 91455 96239 96861 96884 98573 98814 98815