April 9, 2025 - Construction of the road widening and shared-use path continues, including necessary utility relocations. Construction is anticipated to be complete in fall 2025. Future updates will be posted on this page as construction progresses.
This project will add transportation capacity along Lakeview Road from Cushing Drive to Old Statesville Road and accommodate the additional traffic expected as a result of the construction of North Carolina Department of Transportation (NCDOT) I-77 Lakeview Road Direct Connect Interchange(PDF, 6MB). Intersection modifications, additional through/turning lanes, pedestrian facilities and bicycle facilities will be considered.
Roadway modifications will likely be limited to those that can be constructed within the existing public right-of-way with minimal impact to utilities. The project limits are along Lakeview Road from Old Statesville Road (NC115) to Cushing Drive.
The project area is dense with City and NCDOT projects in different phases of planning, design and construction.
Rendering of the roadway after project completion; for illustrative purposes only.
We will make every effort to coordinate our work with all of these adjoining projects; however, please be aware that they each have separate funding sources, schedules, project teams and priorities.
To evaluate the entire Lakeview corridor in order to study the effects of increased vehicular traffic caused by NCDOT's Lakeview Road Direct Connect Interchange project.
To analyze key intersections within the corridor and consider opportunities to increase vehicular capacity and design key features to accommodate pedestrian and bicycle traffic.
To make modifications to the corridor that can improve travel conditions for motorists, cyclists, pedestrians and transit users in the area
During the planning phase, the project team will work with the community to provide insight to the conceptual design. Community meetings will be scheduled throughout the project to keep residents informed and to provide opportunities to share ideas, concerns and opinions with city and state planners and project managers. Details of those meetings will be posted on this page once they are scheduled.
presented May 17, 2018
Emily Perry, PE Senior Project Manager General Services 980.579.3370 emily.perry@charlottenc.gov
Tim Morton Chief Construction Inspector General Services 704.361.5735 tim.morton@charlottenc.gov