These projects will consist of reinforced concrete pipe replacement and realignment. The project pipe will consist of a range of different sizes from 15 inch to 36 inch as well as some elliptical pipe. These projects will also consist of CIPP liner, storm drainage structure replacement, non-standard endwalls, full depth asphalt, curb and gutter, concrete driveway, foundation assessment, foundation protection, boulder toe, soil lifts, and watermain replacement.
Requirements
Insurance Requirements
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
- Automobile-For automobile operations liability
- Constructions Bonds-For bidding, payment, completion of construction projects
- General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
- Workers Compensation-For lost wages and medical expenses of injured workers
Bonding Requirements
The City plans to require the following bond(s) for this solicitation:
- Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
- Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
- Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.
Estimated Total Value
The total project value is anticipated to be:
Contract Term
The term of the project is anticipated to be:
- Through Project Completion