Solid Waste Services is operating on its regular schedule the week of Independence Day. Be sure that carts are at the curb no later than 6 a.m. on collection day. It is an orange recycling collection week.
June 19, 2026 - Thank you for participating in the online project presentation. Your feedback will help the project team as the project moves through design and on to real estate acquisition this spring. Construction is expected to start in late 2027.
Part of the Sidewalks & Pedestrian Safety Program
This project will construct an approximately 0.75-mile-long (4,000 linear feet), 10-foot-wide concrete shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Curt. Specific improvements will also include an 8-foot-wide planting strip, curb & gutter, accessible ramps, driveways and potential drainage infrastructure.
In May and June of 2026, the project team prepared a video presentation that was posted on the project website, alongside a comment form for residents to submit their feedback. Watch the video.
Toni Wilson Senior Engineering Project Manager General Services 704.560.6257 toni.wilson@charlottenc.gov