A complete street is designed to work safely for everyone who uses it. This project keeps vehicle capacity on Shamrock Drive while adding safer crossings and continuous space for walking and biking. It carries the improvements at the Eastway/Shamrock intersection along the full mile of the corridor, and Charlotte-Mecklenburg Storm Water Services is upgrading the storm drainage system at the same time.
Improvements include two roundabouts, continuous sidewalk and buffered bike lanes on both sides of the street, pedestrian refuge islands, ADA curb ramp upgrades, and lighting and visibility improvements.

Rendering: Future roadway with sidewalks, planting strips and buffered bike lanes on both sides. For illustrative purposes only.