Anticipated Posting Date: 2026-08-01
The work includes demolition of the existing 4-inch concrete slab and placement of a new 6-inch reinforced concrete slab, along with associated HVAC and electrical modifications required for the facility improvements. The anticipated construction schedule is approximately 4 to 6 months.
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
The City plans to require the following bond(s) for this solicitation:
The total project value is anticipated to be:
The term of the project is anticipated to be: