Shopton Rd West ITS plus traffic signals

Anticipated Posting Date: 2026-10-01

  • Reference numberN/A
  • StatusUpcoming
  • SummaryThe project limits are Shopton Road West between Steele Creek Road and Westinghouse Boulevard. The project will install single-mode fiber optic cable within the project limits. The fiber may be installed in new directionally bored, hand dug or trenched conduit, existing conduit, and aerial attachments to wood utility poles.

This project includes Ethernet equipment for existing traffic signal communications and the installation of traffic management cameras and metal poles. This project also includes fiber optic cable splicing and testing.. This project will also include all work to install new traffic signals at are Shopton Road West and Rock Island Road and Shopton Road West and Westinghouse Boulevard.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile- For automobile operations liability
  • General Liability- $1,000,000
  • Workers Compensation- $500,000

Estimated Total Value

The total project value is anticipated to be:

  • $1,000,000 - $1,500,000

Contract Term

The term of the project is anticipated to be:

  • 365 Days