Anticipated Posting Date: 2026-03-23
The Design-Builder will work with Owner and Owner’s Advisor to determine the treatment processes, final layout, sizing, and specific facilities to meet the Owner’s goals for this project. The Design-Builder will provide the resources and staff to deliver the final project that will include, but not be limited to: Facility Planning and Preliminary Design, Permitting, Detailed Design, Cost Estimating, Construction, Start-Up and Commissioning.
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
The City plans to require the following bond(s) for this solicitation:
The total project value is anticipated to be:
The City anticipates setting goals for the following types of subcontractor utilization:
The term of the project is anticipated to be: