Anticipated Posting Date: 2027-01-01
Additional work at PC No. 5 includes structural repairs, replacement of exposed piping and valves, modifications to existing chemical feed dosing points, and upgrades to slide and sluice gate components. At the Influent Pump Station (IPS), the project involves replacing existing grit piping and stainless steel air piping. The IPS scope also includes the replacement of slide gate seals, actuators, and stems to ensure continued operational reliability.
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
The City plans to require the following bond(s) for this solicitation:
The total project value is anticipated to be:
The term of the project is anticipated to be:
Print Page
Department: Charlotte Water - Construction
Commodity Code(s): 91200, 91359, 91360, 92597