McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Anticipated Posting Date: 2027-01-01

  • Reference number2027-Q1(Jan-Mar)-CW-18587
  • StatusUpcoming
  • SummaryThis project includes the demolition and disposal of the existing Primary Clarifier No. 5 (PC No. 5) mechanism and associated components, followed by the installation of a new Owner-procured clarifier mechanism.

Additional work at PC No. 5 includes structural repairs, replacement of exposed piping and valves, modifications to existing chemical feed dosing points, and upgrades to slide and sluice gate components. At the Influent Pump Station (IPS), the project involves replacing existing grit piping and stainless steel air piping. The IPS scope also includes the replacement of slide gate seals, actuators, and stems to ensure continued operational reliability.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • Constructions Bonds-For bidding, payment, completion of construction projects
  • Errors & Omissions / Professional Liability-For negligence or failure to perform in a professional capacity
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
  • Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
  • Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $1,000,000 -4,999,999

Contract Term

The term of the project is anticipated to be:

  • Through Project Completion