Irwin Creek WWTP Stormwater Improvements Project

Anticipated Posting Date: 2026-05-01

  • Reference number2026-Q2(Apr-Jun)-CW-19830
  • StatusUpcoming
  • SummaryThis construction contract will replace existing diesel pumps with electric submersible pumps. This will be done at three locations at the existing stormwater outfall locations. The project will also include installation of permanent discharge piping at stormwater outfall 1. This will require electrical duct bank along with wiring and all necessary components to power the pumps.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • Constructions Bonds-For bidding, payment, completion of construction projects
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
  • Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $1,000,000 -4,999,999

Utilization

The City anticipates setting goals for the following types of subcontractor utilization:

  • MBE-Minority Business Enterprise
  • WBE-Women Owned Business Enterprise

Contract Term

The term of the project is anticipated to be:

  • Through Project Completion