Anticipated Posting Date: 2027-02-01
The ranking protocol identifies 18 structures that experience flooding in the 100-year storm event and 7 roads that experience transverse overtopping events that do not meet current standards. The entire neighborhood has received a patchwork of repairs over the years and a holistic project is needed to cost beneficially address the drainage system issues.
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
The City plans to require the following bond(s) for this solicitation:
The total project value is anticipated to be:
The term of the project is anticipated to be:
Print Page
Department: Charlotte Storm Water Services - Construction
Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915