Fiscal Year 2026 Water Main Replacement

Anticipated Posting Date: 2026-04-30

  • Reference number2026-Q2(Apr-Jun)-CW-18568
  • StatusUpcoming
  • SummaryThis construction contract is designated for the replacement of aging water main infrastructure. The scope of work primarily targets water mains that have reached or exceeded their expected service life and are now contributing to operational challenges such as increased maintenance, reduced reliability, and potential service interruptions.

Priority is given to pipeline segments 12 inches in diameter or smaller. This contract supports Charlotte Water's long-term asset management strategy by improving system resilience, reducing unplanned outages, and enhancing overall water service reliability.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • Constructions Bonds-For bidding, payment, completion of construction projects
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
  • Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
  • Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $10,000,000+

Contract Term

The term of the project is anticipated to be:

  • Multi-Year