FY27 Water and Sewer Infrastructure Construction – Contract 1

Anticipated Posting Date: 2026-06-02

  • Reference numberFY27-ITBCON-04
  • StatusUpcoming
  • SummaryThis Project consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvements projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury: $100,000
  • Workers Compensation-For lost wages and medical expenses of injured workers: $500,000
  • Automobile-For automobile operations liability

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $17,000,000

Contract Term

The term of the project is anticipated to be:

  • Not to exceed.

Diversity Participation

The City provides equal opportunity and encourages small business participation in contracts. The Minority and Women Enterprise (MBE and WBE) Established Goal for this project has been set at MBE 10.00% and WBE 7.00%.