Solid Waste Services is operating on its regular schedule the week of Juneteenth. Be sure that carts are at the curb no later than 6 a.m. on collection day. It is an orange recycling collection week.
Anticipated Posting Date: 2027-02-15
Wetland restoration efforts will include regrading, sodding and planting of vegetation, installation of a new pedestrian bridge and retaining wall. Additionally, stream improvements, such as regrading banks and adding riffles, are proposed. The proposed improvements will enhance the overall performance of the system for conveying and treating stormwater.
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
The City plans to require the following bond(s) for this solicitation:
The total project value is anticipated to be:
The term of the project is anticipated to be:
Print Page
Department: Charlotte Storm Water Services - Construction
Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915