Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Anticipated Posting Date: 2027-01-04

  • Reference number2027-Q1(Jan-Mar)-CSWS-20577
  • StatusUpcoming
  • SummaryAsset Management performed an inspection of the dual 60-inch CMP culverts with paved inverts beneath Arbor Glen Ln in June 2023. Proposing CIPP lining on the dual 6" CMP culverts. Replacing the two headwalls.

There are improvements on the side system of the culverts. Remove and replace a catch basin along with 15" RCP. Remove and replace a single catch basin with a double catch basin. Remove and replace a section of 24" RCP.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • Constructions Bonds-For bidding, payment, completion of construction projects
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
  • Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
  • Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $500,000 - 999,999

Contract Term

The term of the project is anticipated to be:

  • Through Project Completion