The Thermal Road Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 695 acres, the project will replace aging infrastructure and provide adequate system capacity.
The project area is located along Thermal Road between Pineburr Road to the east and Charter Place to the west.
November 2023
Charlotte-Mecklenburg Storm Water Services and engineering consultant ESP have acquired most of the easements needed for construction. The project team is working on finalizing the design plans.
*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.
Learn more about project phases.
Storm Water Services
Tyler Howell, PE Project Manager 980.293.2931 Tyler.Howell@charlottenc.gov
Amy Bice, EI Senior Project Manager 704.369.9136 Amy.Bice@charlottenc.gov
Bob Jarzemsky, PE Engineering Program Manager 704.572.2669 Robert.Jarzemsky@charlottenc.gov
November 2023 Mailer(PDF, 698KB)
March 30, 2023 Public Meeting