Sunview/Telfair Storm Drainage Improvement Project

  • Project typeStorm Water Services
Overview

The Sunview/Telfair Storm Drainage Improvement Project involves analysis of existing conditions to determine portions of the storm drainage system needing improvement, planning analysis of improvement alternatives, and design and construction of needed improvements. The project is located within a drainage area of approximately 146 acres. The project area is bordered by Archdale Drive to the north, Old Reid Road to the south, Park Road to the east and Old Reid Road to the west.

Project Updates

March 2024

Charlotte-Mecklenburg Storm Water Services and engineering consultant LandDesign continue with the planning phase. The project will replace aging infrastructure and provide adequate drainage system capacity.

The project team continues to study the existing drainage system and is developing alternative solutions. A public meeting will be held once the project team is ready to present a recommended solution to property owners.

              

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.


Project Phase: Planning

Learn more about project phases.