Sunview/Telfair Storm Drainage Improvement Project

  • Project typeStorm Water Services
Overview

The Sunview/Telfair Storm Drainage Improvement Project involves analysis of existing conditions to determine portions of the storm drainage system needing improvement, planning analysis of improvement alternatives, and design and construction of needed improvements. The project is located within a drainage area of approximately 146 acres. The project area is bordered by Archdale Drive to the north, Old Reid Road to the south, Park Road to the east and Old Reid Road to the west.

Project Updates

November 2025

Charlotte-Mecklenburg Storm Water Services and engineering consultant LandDesign have completed the study of the existing storm drainage system in the Sunview/Telfair project area. 

Next, the project will move into the design phase. During this phase the project team will develop detailed drawings for the proposed improvements.

                    

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.


Project Phase: Planning

Project phase icon - In Planning

Learn more about project phases.