The Pinckney Storm Drainage Improvement Project will reduce street flooding throughout the neighborhood. Located within a drainage area of approximately 150 acres, the project will replace aging infrastructure and provide adequate drainage system capacity. This project is bordered by Pinckney Avenue to the north, Parkwood Avenue to the south, Woodside Avenue to the east and Pegram Street to the west.

Project Updates

September 2026

Charlotte-Mecklenburg Storm Water Services and engineering consultant Woolpert have completed the study of the existing storm drainage system in the Pinckney project area.

Once the study is complete, several alternative solutions will be developed. A public meeting will be held once the project team is ready to present a recommended solution to property owners. 

          

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.


Project Phase: Planning