The Marlowe Storm Drainage Improvement Project will reduce street flooding throughout the neighborhood. Located within a drainage area of approximately 80 acres, the project will replace and/or rehabilitate aging infrastructure and provide improved drainage system capacity. The Marlowe Storm Drainage Improvement Project is bordered by Dublin Road to the north, Wilkinson Boulevard to the south, Weyland Avenue to the east and Ashely Road to the west.
July 2026
Charlotte-Mecklenburg Storm Water Services and engineering consultant ARDURRA Group Inc. have completed the study of the existing storm drainage system in the Marlowe project area.
Alternative solutions are now being developed. A public meeting will be held once the project team is ready to present a recommended solution to property owners.
*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.
Learn more about project phases.
Storm Water Services
Harold Smith, PE Senior Engineer 980-308-3495Harold.Smith@charlottenc.gov
John Keene Senior Project Manager 980-293-2086 John.Keene@charlottenc.gov
Crystal Goode, PE, CFM Program Manager 980-475-9018 Crystal.Goode@charlottenc.gov