The Manor Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 28 acres, the project will replace aging infrastructure and provide adequate system capacity. The project area is bordered by Plantation Place to the north, Fieldbrook Place to the south, Chelsea Drive to the east and Little Sugar Creek to the west.

Project Updates

January 2026

Charlotte-Mecklenburg Storm Water Services and engineering consultant DPR Associates continue with the design phase. 

The project team is coordinating with private utility companies to identify potential conflicts and relocation needs. Next, staff will develop detailed drawings for the proposed improvements.  

                  

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.


Project Phase: Design

The project is in the design phase.