The Hidden Valley Storm Drainage Improvement Project will replace aging infrastructure and reduce flooding throughout the neighborhood. The project is within a drainage area of approximately 1,000 acres. The project will replace and/or rehabilitate aging infrastructure and provide adequate drainage system capacity. There are four culvert locations; Cinderella culvert between Hidden Valley Rd and Munsee St; Hidden Valley Culvert between White Plains Rd and Log Cabin Rd; Monteith Drive culvert between Georgetown Drive and Derrydowne Dr; Snow White Lane Culvert between Spring Garden Lane and Bilmark Ave.

Project Updates

July 2024

Charlotte-Mecklenburg Storm Water Services is working with D&A Wolverine and their surveyor Survey & Mapping Control, Inc. to evaluate a culvert and the storm drainage system in this area. 

Representatives may need to enter your property to collect survey data on the existing system. While state law authorizes access to private property, no building or structure will be entered. 

The survey work is scheduled to begin in July and take about 3 months to complete.

         

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.


Project Phase: Planning