Jan. 31, 2025 - Construction continues on this project with earthwork, concrete, sidewalk installation, curb & gutter and storm drainage. Construction is expected to be complete by mid-2025.
This project will fill in numerous gaps in the existing sidewalk system along both sides of Tuckaseegee Road from Little Rock Road to Westerwood Drive, and along the north side of Tuckaseegee Road from Mulberry Church Road to Mulberry Pond Drive.
To increase connectivity
To improve walkability and pedestrian safety
Jonathan Hamrick Project Manager General Services 980.219.1785 jonathan.hamrick@charlottenc.gov
Maurice Moore Construction Inspector General Services 704.589.7240 maurice.moore@charlottenc.gov