January 30, 2026 - Design for this project is about 75% complete. During this phase, the project team creates the detailed information needed to construct the improvement option that was selected during the planning phase. A public meeting will be scheduled for early 2026. Details will be shared once they are determined.
Part of the Sidewalks & Pedestrian Safety Program
This project will construct an approximately 0.75-mile-long (4,000 linear feet), 10-foot-wide concrete shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Curt. Specific improvements will also include an 8-foot-wide planting strip, curb & gutter, accessible ramps, driveways and potential drainage infrastructure.
Project Goals
The project team will engage the public to get resident feedback and share information about the project. The first meeting is expected to take place in the fall of 2024. Details will be shared once they are determined.
Toni Wilson Senior Engineering Project Manager General Services 704.560.6257 toni.wilson@charlottenc.gov