Aug. 3, 2026 - Starting at 12AM on Monday, Aug. 17, the off-ramp to College St. at Exit 1E off I-277 will close. Contractors will work in the south abutment, install rebar, set up forms and prepare to pour concrete. They will also build barrier walls, install storm water pipe and start fabricating the bridge on site. The ramp will stay closed the duration of construction and re-open in late 2027.
Above: Consultant rendering of the Rail Trail Bridge. For illustrative purposes only. Specific features and amenities could change.
To access College Street, southbound travelers may continue using Exit 1E and use the South Boulevard/Caldwell Street ramp to turn right on South Caldwell Street, then left on Brooklyn Village Avenue. South College Street is the next intersection. Please refer to the map above.
The city works closely with Waze, a GPS mobile app, to provide real-time driving directions based on live traffic updates. We recommend all motorists install and use Waze to ensure the most accurate, up-to-date driving directions.
This project will provide a new bicycle and pedestrian connection over I-277 from the CATS Blue Line Brooklyn Village Station to where the existing Rail Trail ends under the East Morehead Street bridge, north of Carson Street. The project will seamlessly provide Rail Trail users direct access to and from Center City and South End. The design includes a concrete deck, two cable stay arch bridge spans, and various improvements to walkways leading up to the bridge approach areas on both sides of I-277.
To provide safe, direct, car-free access between Uptown and South End for bicyclists and pedestrians
To provide connectivity to the Rail Trail and remove I-277 as an obstacle between South End and Center City
The project team will engage the community at various points in the planning, design and construction process. The following public meetings have taken place:
The map above shows the current route of the Rail Trail and the existing gap over I-277.
The map above illustrates the approximate location of the future bridge.
For illustrative purposes only. Specific features and amenities could change.