March 2, 2026 - This project has entered the design phase. During this phase the project team creates the detailed information needed to construct the improvement option that was selected during the planning phase. Details include plans, specifications, etc.
This project includes the installation of concrete curb & gutter, retaining walls, a storm drainage system and an 8-foot-wide concrete sidewalk along the north side of Old Concord Road from Orchard Bridge Road to Orr Road. The intersection of Old Concord Road and Orr Road will also be improved to include wheelchair ramps, pedestrian signals, a pedestrian refuge island, pedestrian crossings, a truck apron, a 6-foot-wide concrete sidewalk and an 8-foot-wide planting strip at the southwest corner.
Project Goals
Patricia Abney Project Manager General Services 980-214-5845 patricia.abney@charlottenc.gov