Preconstruction & Pre-Storm Drainage Infrastructure Install Meetings

A Preconstruction Meeting is required before any on‑site work begins, for projects with an approved Site Development Plan from the CLT Development Center.

A (Pre-Storm Drainage Infrastructure Installation) meeting is required before starting any storm drainage work that will carry public stormwater on a new or existing public street.

*This request should be used when installing storm pipe and catch basin systems and is not intended for sites limited to grading‑based drainage features such as swales or ditch lines.

Use the appropriate link below to submit the type of request needed. After submission, the form is routed directly to the assigned City inspector, who will contact you to schedule the meeting.

High-Performance Building Rebates & Incentives: Local rebates and incentive programs are available to support the development and construction of high-performance buildings that lower annual operating and utility costs. Explore the link below to learn more about local energy efficiency rebates and incentive opportunities.

Road to a Cleaner Future - City of Charlotte

Who are my LD inspectors?

Visit Charlotte Explorer and type in your project address.

Select the Layers list, click the arrow to the left of "Planning" to expand that layer group. Scroll down to Land Development Erosion Control Coordinators and click the eye to add the layer to the map.

Next, scroll down to Land Development Urban Forestry Commercial/Subdivision and click the eye to add the layer to the map.

Next, scroll down to Land Development Construction Inspectors and click the eye to add the layer to the map.

Zoom to your parcel location, and click on the parcel to identify the inspector for your project.

You can use the arrows in the top right corner of the pop-up box to toggle back and forth between inspectors contact information. If you have further questions contact CLT Development Center Customer Service at 704-336-6692.

Note: the Urban Forestry inspector is also the Zoning inspector. 

Schedule a preconstruction meeting for a project with less than one acre of land disturbance 
*This link should also be used if Erosion Control permitting is handled through NCDEQ, regardless of disturbed acreage.

Schedule a preconstruction meeting for a project with one acre or more land disturbance

Schedule a pre-storm drainage infrastructure installation meeting