WT Harris SUP (JW Clay to N Tryon)

Anticipated Posting Date: 2026-04-01

  • Reference number2026-Q2(Apr-Jun)-DGS-17369
  • StatusUpcoming
  • SummaryA 12' wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path. Project Length = 0.33 miles.

Requirements