Village Lake Dr 2210 Storm Drainage Improvement Project

Anticipated Posting Date: 2026-03-01

  • Reference number2026-Q1(Jan-Mar)-CSWS-17370
  • StatusUpcoming
  • SummaryProject started due to surface depressions along roadway.

City plans to remove and replace corrugated metal pipe with 83 linear feet (LF) of 8’ x 4’ reinforced concrete box culvert; remove and replace two headwalls; remove and replace 311 LF of 15″ reinforced concrete pipe (RCP); remove and replace 42 LF 24″ RCP; remove and replace 27 LF 18″ RCP; bank grading; and remove and replace 85 LF 10” ductile iron pipe of sewer.

Requirements

Estimated Total Value

The total project value is anticipated to be:

Contract Term

The term of the project is anticipated to be: