Description
This project is part of the 4th Parallel Runway Program and includes the construction of parallel Taxiway V and associated connector taxiways in preparation for future Runway 1C-19C. The scope of work involves, but is not limited to, clearing, pavement demolition, CCP taxiway pavement, asphalt taxiway shoulder paving, excavation, hauling and placement of excess material into designated stockpiles on airport property, stormwater drainage, erosion and sediment control, pavement markings, airfield electrical, FAA power and communications, and FAA NAVAID relocations.
Pre-Bid Details
Date: April 17, 2024 at 9:00 a.m. ET
Location: Microsoft Teams (see link in ITB)
Instructions: Non-Mandatory
Bid Opening Instructions
Date: May 15, 2024 at 2:00 p.m. ET
Location: Microsoft Teams (see link in ITB)
Attachments
AVIA ITB 24-37 4PR Bid Package 1 Taxiway V and Connectors(PDF, 2MB)
All ITB activity to take place through the e-Builder portal (see under "Related Information" on right-side for link)