On-Call Roof Maintenance and Repairs

Closing date March 10, 2026, 02:00 PM

  • Reference numberRFP AVIA 26-22
  • StatusOpen
  • SummaryProposal Due Date & Time: March 10, 2026 at 2:00 PM EST

    Solicitation Type: Request for Proposal

    Department: Aviation

Description 

Charlotte Douglas International Airport (CDIA) has responsibility for maintenance and repair of approximately one hundred (100) buildings including the airport terminal. CDIA requires a minimum of two on-call contractors to perform maintenance and emergency roof repairs of these facilities. The selected contractors will enter into a time and materials contract for on-call roof maintenance and repair services on an as needed basis. The work shall include the furnishing of all supervision, labor, materials, and services required to make the necessary repairs. Along with making repairs to roofs, the Contractors shall be required to demolish and remove existing roof materials and dispose of all waste material.

All proposal activities will take place through the e-Bidding portal (see link under "Related Information")