Old Concord Road at Orr Road Sidewalk

Anticipated Posting Date: 2027-05-01

  • Reference numberN/A
  • StatusUpcoming
  • SummaryThis project will install: Concrete sidewalk, concrete driveways, reinforced concrete pipe, retaining walls, traffic signals, truck apron, and curb ramps

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • General Liability $1,000,000
  • Workmens Compensation $500,000
  • Auto Liability

Bonding Requirements

Yes.

Estimated Total Value

The total project value is anticipated to be:

  • $1,000,000 - $4,999,999

Contract Term

The term of the project is anticipated to be:

  • 14 months