The project also replaces an outdated programmable logic controller system and adds a new sludge line to separate gravity-fed and pumped flows. Additional improvements include a new dewatering well system for draining the storage tanks and structural evaluation and repairs to the second digested sludge storage tank.
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
The City plans to require the following bond(s) for this solicitation:
The total project value is anticipated to be:
The term of the project is anticipated to be: