Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

Anticipated Posting Date: 2026-07-01

  • Reference number2026-Q3(Jul-Sep)-DGS-17368
  • StatusUpcoming
  • SummaryThis project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements.

The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.

Requirements