Euclid Avenue 1818 Storm Drainage Improvement Project

Anticipated Posting Date: 2027-06-15

  • Reference number2027-Q2(Apr-Jun)-CSWS-20352
  • StatusUpcoming
  • SummaryThe project involves analysis of existing conditions to determine portions of the storm drainage system needing improvement, and design and construction of needed improvements. The existing storm system experienced a pipe collapse due to poor condition of the pipe.

To address the request and meet level of service design standards the project will remove and replace the existing Storm Drainage Infrastructure within the project scope.

Proposed improvements include removing approximately 343 LF of 18″ storm water pipe and replace with approximately 410 LF of 24″ storm water pipe, add 2 double catch basins and associated items, and remove and replace approximately 357 LF of 8″ sewer pipe, and 3 sewer manholes.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • Constructions Bonds-For bidding, payment, completion of construction projects
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
  • Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
  • Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $1,000,000 -4,999,999

Contract Term

The term of the project is anticipated to be:

  • Through Project Completion