Eastway Storm Drainage Improvement Project

Anticipated Posting Date: 2027-03-15

  • Reference number2027-Q1(Jan-Mar)-CSWS-17293
  • StatusUpcoming
  • SummaryThe project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.

The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west.  This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.

Requirements

Estimated Total Value

The total project value is anticipated to be:

    Contract Term

    The term of the project is anticipated to be: