Anticipated Posting Date: 2026-06-29
The project is intended to improve transfer baggage management, reduce sortation congestion, and enhance overall baggage system resiliency, particularly during irregular operations (IROPs). The proposed EBS facility would use an Individual Carrier System (ICS) tote-based storage system integrated with the existing BHS. The system is anticipated to provide approximately 1,830 storage positions within rack structures, at least two ramp-level baggage makeup carousels with a corresponding circulation service road, and required building and code-compliant systems. The EBS facility is expected to be approximately between 90 to 100 feet tall and may require relocation of existing utilities. It is anticipated that the proposed EBS facility would be a multi-level structure constructed above the existing loading dock.
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
The total project value is anticipated to be:
The term of the project is anticipated to be:
Print Page
Department: Aviation
Commodity Code(s): 91815, 91819, 91897, 92549