Cross Charlotte Trail XCLT - Matheson to Craighead REV 7-2025

Anticipated Posting Date: 2027-04-01

  • Reference number2027-Q2(Apr-Jun)-DGS-14020
  • StatusUpcoming
  • SummaryThe Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way.

The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

July 2025 Update: This project will not go out for public bid; it is now being designed and constructed through a reimbursement agreement with a private developer

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • Constructions Bonds-For bidding, payment, completion of construction projects
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
  • Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
  • Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $10,000,000+

Contract Term

The term of the project is anticipated to be:

  • Through Project Completion