Cindy Lane and Beatties Ford sidewalk gap

Anticipated Posting Date: 2026-10-09

  • Reference numberEB-0000161
  • StatusUpcoming
  • SummaryThis project will bridge a sidewalk gap along the north side of Cindy Lane between Beatties Ford Road and Cindy Park Drive. The purpose of the project is to increase pedestrian mobility along the corridor. The work includes 4-inch concrete sidewalk, 6-inch concrete curb ramps, 2-foot‑6‑inch curb and gutter, 6-inch concrete driveways, asphalt pavement, grading, and storm drainage improvements.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury $1,000,000
  • Workers Compensation-For lost wages and medical expenses of injured workers $500,000

Estimated Total Value

The total project value is anticipated to be:

Contract Term

The term of the project is anticipated to be:

  • 180 days