Anticipated Posting Date: 2027-01-01

  • Reference number2027-Q1(Jan-Mar)-CDT-16788
  • StatusUpcoming
  • SummaryThis project involves repairing bridge structures in various locations within the city limits. This work shall consist of furnishing all labor, equipment, and materials to repair noted structures.

Work includes but not limited to: concrete pavement repairs, asphalt surface sealing / repair / replacement, debris removal, soil / erosion repairs, bridge substructure / superstructure repairs, expansion joint repair / replacement, barrier rail repairs, guardrail repairs, cleaning and painting bridge structures, sealing concrete wearing surface, culvert repairs, and repairs as deemed necessary by the engineer; removing, containment and disposal of existing materials; seeding and mulching all grassed areas disturbed; all incidental items necessary to complete the project as specified and shown on the Bridge Structures Repair Details and Drawings.

Requirements

Insurance Requirements

The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:

  • Automobile-For automobile operations liability
  • Constructions Bonds-For bidding, payment, completion of construction projects
  • General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
  • Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements

The City plans to require the following bond(s) for this solicitation:

  • Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
  • Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value

The total project value is anticipated to be:

  • $5,000,000 - 9,999,999

Utilization

The City anticipates setting goals for the following types of subcontractor utilization:

  • Federal - Yes, goals are exempt by policy

Contract Term

The term of the project is anticipated to be:

  • One Year