Anticipated Posting Date: 2026-06-08
The duration of the project is directly related to the manufacture of baggage handling components, which could result in an overall project duration between six months and eighteen months. Much of the work will be required to be performed at night, in coordination with the main baggage handling area and baggage handling system schedules.
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:
The City plans to require the following bond(s) for this solicitation:
The total project value is anticipated to be:
The term of the project is anticipated to be:
Print Page
Department: Aviation
Commodity Code(s): 03526, 90910, 90911