Description
The project involves the interior upfit of approximately 2,000 square feet of existing shell space on the baggage level of the main terminal at CLT Airport, including a baggage handling control room, support space, and a break room. The predominant work will consist of typical finishes such as drywall, ceilings, flooring, mechanical, electrical, plumbing, and fire protection.
Pre-Bid Meeting
Date: Tuesday, August 11, 2026, at 9:00 a.m. EST
Location: 5601 Wilkinson Boulevard Charlotte, NC 28208 in the Tomcat Conference Room
Instructions: Non-Mandatory
Bid Opening Instructions
Date: Tuesday, September 1, 2026, at 2:00 p.m. EST
Location: Microsoft Teams (see link in ITB)
Attachments
AVIA-27-04-BHS-Control-Room-Relocation-Contract-Finalized(PDF, 2MB)
Bid Tab
To be inserted at a later date.
All ITB activity to take place through the Bid Portal (see under "Related Information" on right-side for link)