Description
The South Ramp Expansion Program for Charlotte Douglas International Airport (also referred to as “CLT,” “Airport,” or “Owner”) consists of the design and construction of a three-phase program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. South Ramp Expansion Phase I will provide unimpeded dual Airplane Design Group (ADG) III and V taxilanes for the southeast area. Phase II will provide continuity of the unimpeded dual ADG III and V taxilanes for the center area of the ramp. The program also provides for the relocations of the Airport Surveillance Radar (ASR) and of the Center Lighting Vault, the two projects that are the subject of this RFQ. Finally, Phase III will complete the linear and unimpeded taxilane connectivity for the southwest corner of the terminal ramp.
This Request for Qualifications will be used to select a Firm to provide the design, construction administration, and related services for the two facility relocation projects within the existing scope of the program as described above. The current program consists of 5 projects, three airfield and two enabling facility relocations, which are listed below:
- South Ramp Expansion Phase 1 (not a subject of this RFQ)
- South Ramp Expansion Phase 2 (not a subject of this RFQ)
- South Ramp Expansion Phase 3 (not a subject of this RFQ)
- Airport Surveillance Radar Relocation (ASR) (the subject of this RFQ)
- Center Airfield Electrical Lighting Vault Relocation (CLV) (the subject of this RFQ)
Attachments
AVIA RFQ 26-08 ASR and Center Airfield Lighting Vault Relocation.pdf(PDF, 1MB)
All RFQ activity to take place through the Bidding portal (see under "Related Information" on right-side for link)