Prosperity Church Road Improvements (Old Ridge Road to Benfield Road)

  • Project typeNeighborhoods
  • Project budget$7.1 million (includes all costs associated with the project such as planning and design, acquiring the right-of-way, utility relocation, consultant fees, construction, signalization, permits and landscaping)
  • Project phaseDesign

part of the Prosperity Village Comprehensive Neighborhood Improvement Program (CNIP)

Project Overview

Thisproject proposes to widen Prosperity Church Road from Old Ridge Road northward to Benfield Road. Improvements could include curb & gutter, sidewalk, storm drainage, bicycle lanes, on-street parking and a roundabout at Prosperity Church Road and Prosperity Ridge Road. This project is recommended in the Prosperity Hucks Area Plan (2015).

Project Goals 

  • To maintain, stabilize and revitalize the neighborhood through comprehensive infrastructure improvements 

  • To strengthen the neighborhood and surrounding community

  • To improve infrastructure features in the neighborhood such as storm drainage, curb & gutter, sidewalk and bicycle lane features

Public Involvement

The project team holds several public meetings during the lifespan of a project. The following meetings have taken place so far:

  • June 25, 2019 at Crossway Community Church - Project team introduced the project and received feedback and questions.