Description
This project will be to retrofit the existing stormwater basin along airport Drive by replacing the existing riser structure, removal and replacement of approximately 88 LF of 30" pipe, lining the existing 30" pipe underneath the roadway, and constructing a wingwall to protect the outfall.
Pre-Bid Details
Date: 9/30/2025 at 10:00 AM
Location: Microsoft Teams
Instructions: See advertisement
Bid Opening Details
Date: 10/15/2025 at 2:00 PM
Location: Microsoft teams
Instructions: See advertisement