Vines, to be planted in larger planter boxes, will reach out from side to side and eventually meet and intertwine above Upper Little Sugar Creek on the "Living Bridge," created by artist Laurie Lindquist
Northeast Corridor Infrastructure (NECI) Program
This project originated from the Northeast Corridor Infrastructure Program (NECI) planning effort. It connects 25th Street over Upper Little Sugar Creek, requiring a bridge or culvert structure to be added. The conceptual cross-section includes two travel lanes, bike lanes, curb & gutter, sidewalk & planting strip and street trees, as well as on-street parking (from the bridge to North Brevard Street).